Monday 2 March 2009

second day of filming

in today's lesson we had to finish our filming, however when we got to the Barbican we saw that first of all there was no ice, so the match cuts would not have fitted. it was also raining, a lot. so we had to do all the filming again in the rain. this was not  all that bad, the rain created a dramatic tension to the film. it was the 3 hour lesson so we had no breaks to finish all the filming in one day. however when we where filming the guards came up to us to tell us that the Barbican center is actually a private place and not public as we thought. so we had to take 5 minutes to go to the reception to ask for permission, they where fine with it and we continued filming. we were able to do all the filming in the time we had to do it. the only problems we had was to keep the camera out of the rain, so we used a umbrella over the camera to keep it dry. 

No comments: